| |
| |
Acknowledgements | |
| |
| |
Preface | |
| |
| |
Assembly of Building | |
| |
| |
Developments of Tall Buildings | |
| |
| |
Building Performance and System Integration | |
| |
| |
Cost, Quality and Time | |
| |
| |
Building Regulations and Control | |
| |
| |
Constraints and Resources | |
| |
| |
Environmental Requirements | |
| |
| |
Industrialisation | |
| |
| |
Sustainable Construction | |
| |
| |
Embodied energy | |
| |
| |
Green building materials | |
| |
| |
Robotics in Construction | |
| |
| |
References | |
| |
| |
Safety and Health | |
| |
| |
Accident Prevention | |
| |
| |
Safe Working Environment | |
| |
| |
Falls of person | |
| |
| |
Falling objects | |
| |
| |
Acts and Regulations | |
| |
| |
Safety and Health Management System | |
| |
| |
Risk Management | |
| |
| |
Risk Assessment | |
| |
| |
Review period | |
| |
| |
Record maintenance | |
| |
| |
Communication | |
| |
| |
Offences and penalties | |
| |
| |
References | |
| |
| |
Site Investigation | |
| |
| |
General | |
| |
| |
Information to be Retrieved | |
| |
| |
Stages of Site Investigation | |
| |
| |
Planning | |
| |
| |
Desk Study | |
| |
| |
Site Reconnaissance | |
| |
| |
Ground Investigation | |
| |
| |
Field tests | |
| |
| |
Subsurface mapping | |
| |
| |
Trial pitting | |
| |
| |
Exploratory boreholes | |
| |
| |
In situ testing | |
| |
| |
Laboratory tests | |
| |
| |
Site Works and Setting Out | |
| |
| |
References | |
| |
| |
Foundation | |
| |
| |
General | |
| |
| |
Soil Characteristics | |
| |
| |
Foundation Systems | |
| |
| |
Types of Foundation | |
| |
| |
Shallow Foundation | |
| |
| |
Deep Foundation | |
| |
| |
Caisson | |
| |
| |
Piles | |
| |
| |
Non-displacement pile | |
| |
| |
Bored pile | |
| |
| |
Barrette pile | |
| |
| |
Displacement piles | |
| |
| |
Precast reinforced concrete piles | |
| |
| |
Steel preformed piles | |
| |
| |
Composite piles | |
| |
| |
Driven in situ/cast-in-place piles | |
| |
| |
Pile Load Tests | |
| |
| |
Static load tests | |
| |
| |
Compression load test | |
| |
| |
Uplift pile load test | |
| |
| |
Dynamic load tests | |
| |
| |
References | |
| |
| |
Basement Construction | |
| |
| |
General | |
| |
| |
Construction Methods | |
| |
| |
Construction in excavations supported by sheet piling | |
| |
| |
Construction in excavations supported by reinforced concrete diaphragm wall | |
| |
| |
Construction in excavations supported by contiguous bored pile or secant pile wall | |
| |
| |
Control of Groundwater | |
| |
| |
Open Cut Technique | |
| |
| |
Cut and Cover Technique | |
| |
| |
Top Down Technique | |
| |
| |
Soil Movement Monitoring | |
| |
| |
Shoring | |
| |
| |
Underpinning | |
| |
| |
Basement Waterproofing | |
| |
| |
Membrane system | |
| |
| |
Integral system | |
| |
| |
Interior cavity and exterior drainage system | |
| |
| |
Joints and penetration | |
| |
| |
References | |
| |
| |
Materials Handling and Mechanisation | |
| |
| |
Materials Handling | |
| |
| |
Access considerations | |
| |
| |
Storage considerations | |
| |
| |
Classification of materials | |
| |
| |
Mechanisation | |
| |
| |
Earthmoving | |
| |
| |
Horizontal and vertical movements | |
| |
| |
Erection of Tower Cranes | |
| |
| |
Erection of Climbing Cranes | |
| |
| |
Factors Affecting the Selection and Location of Tower Cranes | |
| |
| |
Selection criterion for tower cranes | |
| |
| |
Location criterion for tower cranes | |
| |
| |
References | |
| |
| |
Wall and Floor Construction | |
| |
| |
Structural Systems | |
| |
| |
M&E Systems | |
| |
| |
Core Wall Construction | |
| |
| |
Slipform | |
| |
| |
Jumpform | |
| |
| |
Climbing form | |
| |
| |
Floor Construction | |
| |
| |
Flying form | |
| |
| |
False ceiling | |
| |
| |
Raised floor | |
| |
| |
Precast Prefabricated Elements | |
| |
| |
Advantages of precast/prefabrication | |
| |
| |
Disadvantages of precast/prefabrication | |
| |
| |
Construction process | |
| |
| |
Prestressed Elements | |
| |
| |
Advantages of prestressed concrete | |
| |
| |
Disadvantages of prestressed concrete | |
| |
| |
Pre-tensioning | |
| |
| |
Post-tensioning | |
| |
| |
On-site operation | |
| |
| |
Steel Structures | |
| |
| |
Structural steel frame | |
| |
| |
Steel decking | |
| |
| |
Concrete | |
| |
| |
Concrete admixtures | |
| |
| |
Batching plant | |
| |
| |
Ready-mixed concrete | |
| |
| |
Framework | |
| |
| |
Lateral pressure of fresh concrete | |
| |
| |
Column form | |
| |
| |
Wall form | |
| |
| |
Scaffoldings | |
| |
| |
Bintangor/bamboo scaffolds | |
| |
| |
Independent tied scaffolds | |
| |
| |
Couplers | |
| |
| |
Ties | |
| |
| |
References | |
| |
| |
External Wall Construction | |
| |
| |
General | |
| |
| |
Masonry Brickwall | |
| |
| |
Cast in situ RC Walls | |
| |
| |
Precast Concrete Panel | |
| |
| |
Glass reinforced polyester (GRP) | |
| |
| |
Glass reinforced concreted (GRC) | |
| |
| |
Curtain Walling | |
| |
| |
First generation (1800-1960) | |
| |
| |
Second generation (1960-1980) | |
| |
| |
Third generation (1980+) | |
| |
| |
Stick system | |
| |
| |
Unitised/panelised system | |
| |
| |
Water Penetration | |
| |
| |
Joints | |
| |
| |
Wind Pressures | |
| |
| |
References | |
| |
| |
Roof Construction | |
| |
| |
Structural Forms | |
| |
| |
Beams and Slabs | |
| |
| |
Flat Roofs | |
| |
| |
Lattice and Girder | |
| |
| |
Steel Sheet Roofs | |
| |
| |
Truss Roofs | |
| |
| |
Space Frames | |
| |
| |
Shell Roofs | |
| |
| |
Folded Plate Roofs | |
| |
| |
Cable Supported Roofs | |
| |
| |
Roof Decks | |
| |
| |
Installation process | |
| |
| |
Drainage and durability | |
| |
| |
Thermal properties | |
| |
| |
Glass Roof | |
| |
| |
References | |
| |
| |
Index | |