Contributors | |
| |
| |
Acknowledgments | |
| |
| |
Introduction | |
| |
| |
| |
| |
Client-Consultant Selection | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
What Clients Should Look for in a Consultant | |
| |
| |
| |
What Consultants Should Look for in a Client | |
| |
| |
| |
The Consultant Selection Process | |
| |
| |
| |
The Problem with Competitive Fee Bidding | |
| |
| |
| |
An Analysis and Comparison of the Maryland and Florida Procurement Systems | |
| |
| |
| |
Conclusion | |
| |
| |
| |
The Professional Services Agreement | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
The Contract (The Who, What, When, and How Much) | |
| |
| |
| |
Terms and Conditions | |
| |
| |
| |
Risk and Reward | |
| |
| |
| |
Engineering Services During Construction | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Subsurface Investigations and Geotechnical Report Preparation | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
The Challenge of Subsurface Construction | |
| |
| |
| |
Background | |
| |
| |
| |
Subsurface Investigations | |
| |
| |
| |
Geotechnical Data Report | |
| |
| |
| |
Geotechnical Interpretation | |
| |
| |
| |
Geotechnical Interpretive Report | |
| |
| |
| |
Information Dissemination | |
| |
| |
| |
Geotechnical Design Summary Report | |
| |
| |
| |
Geotechnical Baseline Report | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Preparation of Contract Documents for Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Preliminary Considerations | |
| |
| |
| |
Identifying, Assessing, and Allocating Risk | |
| |
| |
| |
Translating Risk Allocation Decisions into Contract Document Provisions | |
| |
| |
| |
Risk Management Implications for the Professional Involved in the Preparation of Contract Documents | |
| |
| |
| |
Design-Build Issues | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Risk Management Considerations for Complex Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Definition of a Complex Subsurface Project | |
| |
| |
| |
Project Phases | |
| |
| |
| |
Project Players | |
| |
| |
| |
Sources of Uncertainty/Risk | |
| |
| |
| |
Environmental Constraints/Impacts | |
| |
| |
| |
Management Enhancements | |
| |
| |
| |
STEPS Approach to Risk Management | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Engineers' Involvement in Construction Means and Methods on Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
The Customary Construction Roles | |
| |
| |
| |
Construction Means and Methods in Design Engineering | |
| |
| |
| |
Distinctions of Subsurface Engineering | |
| |
| |
| |
Special Subsurface Construction Problems | |
| |
| |
| |
Suggested Approaches to Managing the Risks | |
| |
| |
| |
Health and Safety Issues | |
| |
| |
| |
Engineers' Expanded Responsibility for Construction Means and Methods | |
| |
| |
| |
Design of Means and Methods on Behalf of the Contractor | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Risk Management Considerations for Engineers Engaged by Contractors on Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Overview | |
| |
| |
| |
Consulting Engineering Services to Contractors | |
| |
| |
| |
The Nature of Services for Contractors | |
| |
| |
| |
Contractor Expectations of Engineers | |
| |
| |
| |
Engineers' Expectations of Contractors | |
| |
| |
| |
Risks to Engineers | |
| |
| |
| |
Conflict of Interest | |
| |
| |
| |
Risk Management Strategies | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Role of the Professional Consultant in the Evaluation of Differing Site Conditions Claims | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
The Differing Site Conditions Clause | |
| |
| |
| |
The Professional Consultant's Role in the Investigation and Evaluation of Differing Site Conditions Claims | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Dispute Resolution Mechanisms for Differing Site Conditions Claims | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Risk Allocation on Subsurface Projects | |
| |
| |
| |
Dispute Resolution Processes | |
| |
| |
| |
Dispute Review Boards | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Professional Liability and Risk Allocation/Management Considerations for Design and Construction Management Professionals Involved in Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Professional Liability of Design and Construction Management Professionals: Basic Principles | |
| |
| |
| |
Liability to Client | |
| |
| |
| |
Contract-Based Liability | |
| |
| |
| |
Negligence-Based Liability | |
| |
| |
| |
Liability to Non-Clients | |
| |
| |
| |
Negligence-Based Liability | |
| |
| |
| |
Negligent Misrepresentation | |
| |
| |
| |
Professional Liability of Design and Construction Management Professionals: Specific Context of Subsurface Projects | |
| |
| |
| |
Risk Allocation Principles for Site Conditions | |
| |
| |
| |
Contractual Risk Allocation--Subsurface Conditions | |
| |
| |
| |
Design-Bid-Build Subsurface Projects: Risk Allocation Principles for Design Adequacy and Construction Means and Methods | |
| |
| |
| |
Traditional Risk Allocation for Design Adequacy and Construction Means and Methods | |
| |
| |
| |
Design Adequacy--Risk Allocation | |
| |
| |
| |
Construction Means and Methods--Risk Allocation | |
| |
| |
| |
Reallocation of Risk for (a) Design Adequacy and (b) Construction Means and Methods | |
| |
| |
| |
Reallocation of Risk for Design Adequacy | |
| |
| |
| |
Reallocation of Risk for Construction Means and Methods | |
| |
| |
| |
Application of Risk Allocation Principles for Design Adequacy in the Specific Context of Subsurface Conditions | |
| |
| |
| |
Design-Build Subsurface Projects: Risk Allocation Principles and Professional Liability Risk | |
| |
| |
| |
Professional Standard of Care--Warranty Liability | |
| |
| |
| |
Owner Involvement in Design of Design-Build Projects | |
| |
| |
| |
Professional Liability Risk During Construction Phase | |
| |
| |
| |
"Bridging": Professional Liability Implications | |
| |
| |
| |
Design Professional as Owner's Consultant | |
| |
| |
| |
Design Professional as Part of the Design-Build Team | |
| |
| |
| |
Professional Liability Risk--Site Conditions | |
| |
| |
| |
Relationship of Risk Allocation for Subsurface Conditions Between Owner and Contractor to Risk of Professional Liability | |
| |
| |
| |
Professional Liability Claims in the Specific Context of Subsurface Projects | |
| |
| |
| |
Recommendations for Managing the Risk of Professional Liability on Subsurface Projects | |
| |
| |
| |
Clear and Adequate Scope Definition | |
| |
| |
| |
Standard of Care and Indemnification | |
| |
| |
| |
Risk Identification and Fair Allocation | |
| |
| |
| |
Definition and Allocation of Roles and Responsibilities Regarding Design and Construction Means and Methods | |
| |
| |
| |
The Baseline Approach and Construction Means and Methods | |
| |
| |
| |
Third Party--Liability | |
| |
| |
| |
Conclusion | |
| |
| |
| |
Insurance for Subsurface Projects | |
| |
| |
| |
| |
Introduction | |
| |
| |
| |
Relationship of Contracts to Insurance | |
| |
| |
| |
Types of Insurance Coverage | |
| |
| |
| |
Professional Liability Insurance | |
| |
| |
| |
Commercial General Liability Insurance | |
| |
| |
| |
Excess/Umbrella Liability Insurance | |
| |
| |
| |
Builder's Risk Insurance | |
| |
| |
| |
Construction Equipment Insurance | |
| |
| |
| |
Workers' Compensation and Employer's Liability | |
| |
| |
| |
Contractors' Operations and Professional Services Environmental Insurance | |
| |
| |
| |
Design-Build Risk and Insurance Issues | |
| |
| |
| |
Specimen Insurance Article--Prime Contract | |
| |
| |
| |
Wrap-Up Insurance Programs | |
| |
| |
| |
Conclusion--Key Insurance/Liability Issues on Projects | |
| |
| |
Appendix to Chapter 10 | |
| |
| |
Index | |