| |
| |
| |
State of the Art in the Field | |
| |
| |
| |
The Product Lifecycle | |
| |
| |
| |
The Engineering Design Process | |
| |
| |
| |
Definitions and Concepts | |
| |
| |
| |
The Problem Solving Process | |
| |
| |
| |
Concurrent Engineering | |
| |
| |
| |
Standards | |
| |
| |
| |
Fundamentals | |
| |
| |
| |
Highlights on the ISO GPS Features | |
| |
| |
| |
Design Methods | |
| |
| |
| |
DfX Methods | |
| |
| |
| |
Overview | |
| |
| |
| |
Design for Manufacturing - DfM | |
| |
| |
| |
Design for Assembly - DfA | |
| |
| |
| |
Design for Test and Maintenance - DfTM - and Design for Verification - DfV | |
| |
| |
| |
Design for Reliability - DfR | |
| |
| |
| |
Design for Environment - DfE | |
| |
| |
Summary | |
| |
| |
References | |
| |
| |
| |
The DGLs-CF - Introduction and Background | |
| |
| |
| |
Overview of the History of the DGLs | |
| |
| |
| |
First Release of the DGLs. The Beginning | |
| |
| |
| |
Conceptual Diagram | |
| |
| |
| |
Knowledge Matrix | |
| |
| |
| |
Case Study | |
| |
| |
| |
Discussion | |
| |
| |
| |
Second Release of the DGLs. Improvements and the Synergy with the ISO GPS | |
| |
| |
| |
Conceptual Diagram | |
| |
| |
| |
Knowledge Matrix | |
| |
| |
| |
Case Study | |
| |
| |
| |
Discussion | |
| |
| |
| |
Third Release of the DGLs. Thinking Big | |
| |
| |
| |
Conceptual Diagram | |
| |
| |
| |
Knowledge Matrix | |
| |
| |
| |
Roadmap for the Adoption of the DGLs | |
| |
| |
| |
Case Study | |
| |
| |
| |
Discussion | |
| |
| |
Summary | |
| |
| |
References | |
| |
| |
| |
Detailed Description of the DGLs-CF | |
| |
| |
| |
Conceptual Diagram | |
| |
| |
| |
IDEFO Fundamentals | |
| |
| |
| |
Purpose, Viewpoint and the Node A-0 of the DGLs-CF IDEFO Diagram | |
| |
| |
| |
Purpose and Viewpoint | |
| |
| |
| |
The Node A-0 - TOP Level | |
| |
| |
| |
The Node A0. The Main Phases and the Modules | |
| |
| |
| |
Overview of the Three Main Phases | |
| |
| |
| |
Overview of the Seven Modules | |
| |
| |
| |
The Node A1. First Setup | |
| |
| |
| |
Activities | |
| |
| |
| |
Modules of Interest Here | |
| |
| |
| |
The Node A2. Technological Configuration | |
| |
| |
| |
Activities | |
| |
| |
| |
Modules of Interest Here | |
| |
| |
| |
The Node A3. Redesign/Reconfiguration Package Generation | |
| |
| |
| |
Activities | |
| |
| |
| |
Modules of Interest Here | |
| |
| |
| |
Discussion | |
| |
| |
Summary | |
| |
| |
References | |
| |
| |
| |
Adopting the DGLs-CF in the Field | |
| |
| |
| |
Rapid Prototyping - RP - Technologies | |
| |
| |
| |
Coordinate Measuring Machines - CMMs | |
| |
| |
| |
First Case Study. A Mechanical Bracket Built Using FDM | |
| |
| |
| |
FDM Fundamentals | |
| |
| |
| |
First Setup | |
| |
| |
| |
Technological Configuration | |
| |
| |
| |
Redesign/Reconfiguration Package Generation | |
| |
| |
| |
Second Case Study. A Mould Insert Built Using SLA | |
| |
| |
| |
SLA Fundamentals | |
| |
| |
| |
First Setup | |
| |
| |
| |
Technological Configuration | |
| |
| |
| |
Redesign/Reconfiguration Package Generation | |
| |
| |
| |
Third Case Study. An Angle-Shaped Connector Built Using SLS | |
| |
| |
| |
SLS Fundamentals | |
| |
| |
| |
First Setup | |
| |
| |
| |
Technological Configuration | |
| |
| |
| |
Redesign/Reconfiguration Package Generation | |
| |
| |
Summary | |
| |
| |
References | |
| |
| |
| |
Discussion and Hints for Future Work | |
| |
| |
| |
Conceptual Diagram and Knowledge Organisation | |
| |
| |
| |
Knowledge Description and ISO GPS Adoption | |
| |
| |
| |
Product Features and Technological Characteristics | |
| |
| |
| |
Rules, Compatibility Expressions and Actions | |
| |
| |
| |
Costs | |
| |
| |
| |
Implementation/Automatisms | |
| |
| |
| |
DGLs-CF Adoption Process | |
| |
| |
| |
Activity Timing and Concurrencies | |
| |
| |
| |
DGLs-CF Usability | |
| |
| |
Summary | |
| |
| |
References | |
| |
| |
Appendix. Generation of Some Meaningful Compatibility Expressions | |