Skip to content

Insulating, Level 2

Best in textbook rentals since 2012!

ISBN-10: 0139094172

ISBN-13: 9780139094170

Edition: 1997 (Student Manual, Study Guide, etc.)

Authors: NCCER

List price: $80.00
Blue ribbon 30 day, 100% satisfaction guarantee!
Out of stock
We're sorry. This item is currently unavailable.
what's this?
Rush Rewards U
Members Receive:
Carrot Coin icon
XP icon
You have reached 400 XP and carrot coins. That is the daily max!

Customers also bought

Book details

List price: $80.00
Copyright year: 1997
Publisher: Prentice Hall PTR
Binding: Paperback
Pages: 296
Size: 8.50" wide x 10.85" long x 0.80" tall
Weight: 1.496
Language: English

19201 Installing Flexible Foam Insulation (32.5 Hours)
Covers proper tool use and procedures for installing flexible foam insulation, including how to cut and install flexible foam insulation on pipe fittings, valves, flanges, equipment, and air ducts
19202 Installing Blanket Insulation for Ducts (7.5 Hours)
Covers fiberglass blanket installation to ducts and apparatus and discusses vapor-sealed blanket insulation facings
19203 Installing Board Insulation for Ducts (20 Hours)
Covers fiberglass board insulation applications, such as cutting fiberglass board insulation to fit over standing seams and stiffeners, vapor-seal applications, and cutting and installing fiberglass board insulation on round or oval ducts
19204 Installing Calcium Silicate/expanded Perlite Pipe Insulation (15 Hours)
Discusses the safe handling and storage of calcium silicate pipe insulation, how to make accurate cuts, and how to install single- and double-layers of calcium silicate pipe insulation
19205 Installing Mineral Wool Insulation (12.5 Hours)
Describes the measuring requirements for mineral wool insulation and how to cut and score mineral wool insulation
Also discusses the various attachments used on mineral wool, installation methods, sealing requirements, and how to use pin welding equipment
19206 Installing Rigid Foam Insulation (20 Hours)
Covers the proper use of tools handling and storage of rigid foam insulation measuring, cutting, installing, and sealing rigid foam plastic and cellular glass insulation cryogenic installation expansion joints contraction joints and vapor stops
19207 Installing Board and Block Insulation (17.5 Hours)
Covers the measuring requirements of board and block insulation scoring, beveling, and cutting methods and how to install board and block insulation on flat or curved surfaces and on large diameter tanks
19208 Cement and Fabric Finishes & Mastics (10 Hours)
Covers the proper use of finishing tools, cleanup and protection procedures, and the limitations of cements, fabric finishes, and mastics
19209 Plumbing Systems (7.5 Hours)
Covers cold and hot water plumbing systems, drainage systems in buildings, insulation requirements on plumbing systems, and piping hook-ups
19210 Chilled and Hot Water Heating Systems (5 Hours)
Covers chilled and hot water heating and dual-temperature systems, including the types of pipes and equipment used in various systems
Explains which systems require insulation and why