Skip to content

Cisco Switched Internetworks VLANs, ATM and Voice-Data Integration

Best in textbook rentals since 2012!

ISBN-10: 0071346465

ISBN-13: 9780071346467

Edition: 1999

Authors: Chris Lewis

List price: $55.00
Blue ribbon 30 day, 100% satisfaction guarantee!
what's this?
Rush Rewards U
Members Receive:
Carrot Coin icon
XP icon
You have reached 400 XP and carrot coins. That is the daily max!

Description:

Cisco is the world's largest supplier of routers and related technologies. The newest piece of hardware in the Cisco line of products is the Cisco Catalyst Switch. This book presents a real world view of how to actually use this family of products.
Customers also bought

Book details

List price: $55.00
Copyright year: 1999
Publisher: McGraw-Hill Osborne
Binding: Paperback
Pages: 500
Size: 7.50" wide x 9.25" long x 1.25" tall
Weight: 1.892
Language: English

Acknowledgmentsp. ix
Introductionp. xi
Switching Technology Primerp. 1
Objectivesp. 2
Network Devicesp. 2
Switching Conceptsp. 10
The Briefest of Introductions to ATMp. 20
Summaryp. 33
Switched VLANsp. 35
Objectivesp. 36
VLAN Environmentsp. 36
VLAN Trunkingp. 46
FDDI VLANsp. 52
Spanning Tree Optimizationp. 57
Fast EtherChannelp. 63
Gigabit Ethernetp. 67
CGMP and Multicastsp. 70
Summaryp. 77
ATM Operation and WAN Switchingp. 79
Objectivesp. 80
Introduction to UNI Signalingp. 80
ATM Routing and NNI Signalingp. 88
ATM and IP Integrationp. 103
LANEp. 108
MPOAp. 114
A Word on RFC 1483p. 116
Tag Switchingp. 117
Summaryp. 125
Configuring Workgroup Switchesp. 127
Introductionp. 128
Connecting a 2900XL Series Switch into Your Networkp. 128
2916XL Hardware Featuresp. 136
Upgrading the IOSp. 137
Modifying the Configurationp. 139
VLAN Assignment and Inter VLAN Communicationp. 153
Using the SPAN Port for LAN Analysisp. 161
Saving and Retrieving Configurationsp. 162
Typical Base Configurationp. 164
Password Recoveryp. 167
Workgroup Voice over IPp. 169
Summaryp. 211
Implementing Large-Scale Switched LANsp. 215
Introductionp. 216
Catalyst 5000 and 5500 Hardwarep. 216
Catalyst 5K Initial Configurationp. 226
Ethernet Module Configurationp. 245
Route Switch Module Support for VLANsp. 270
Catalyst 5K Token Ring Implementationp. 275
Catalyst 5K FDDIp. 284
ATM Operation on Catalyst 5K Switchesp. 288
Summaryp. 296
Implementing ATM Switchingp. 299
Introductionp. 300
Overview of ATM Processors for Cisco Routersp. 300
Basic ATM Processor Configurationp. 303
Configuring Classic IP Over ATM on ATM Router Interfaces (RFC 1577)p. 310
Overview of Configuring PPP Services on ATM Router Interfacesp. 316
Introduction to the LS1010p. 318
Basic LS1010 Configurationp. 318
IISP and PNNI for the LS1010p. 330
Configuring LANE on the LS1010p. 335
Overview of LANE 2.0 and MPOA for the LS1010p. 340
LS1010 Applicationsp. 345
Summaryp. 355
Implementing Switched Networksp. 359
Introductionp. 360
Network Implementation Goalsp. 361
Common Switched Network Designp. 376
Two Alternatives in Putting the Three Layers Togetherp. 386
Redesigning the Routed to a Switched Networkp. 388
Redesigning Acme's Routed Networkp. 390
Summaryp. 396
Indexp. 399
Table of Contents provided by Syndetics. All Rights Reserved.