| |
| |
Foreword | |
| |
| |
Preface | |
| |
| |
Acknowledgments | |
| |
| |
List of Enablers and Subenablers in Chapter 7 | |
| |
| |
List of Figures and Numbered Text Boxes | |
| |
| |
| |
Introduction | |
| |
| |
| |
Introducing Lean Systems Engineering and Lean Enablers for Systems Engineering | |
| |
| |
| |
Organization of the Book | |
| |
| |
| |
A Brief History of Recent Management Paradigms | |
| |
| |
| |
From TQM to Six Sigma and Lean | |
| |
| |
| |
Lean Six Sigma | |
| |
| |
| |
Lean Fundamentals | |
| |
| |
| |
Value | |
| |
| |
| |
Waste | |
| |
| |
| |
Lean Principles | |
| |
| |
| |
Principle 1: Value | |
| |
| |
| |
Principle 2: Map the Value Stream | |
| |
| |
| |
Principle 3: Flow | |
| |
| |
| |
Principle 4: Pull | |
| |
| |
| |
Principle 5: Perfection | |
| |
| |
| |
Principle 6: Respect for People | |
| |
| |
| |
The Lean Symphony of the Principles | |
| |
| |
| |
Lean in Product Development | |
| |
| |
| |
Review of Progress | |
| |
| |
| |
The Method of Lean Product Development Flow (LPDF) | |
| |
| |
| |
Introduction to LPDF | |
| |
| |
| |
Lean Manufacturing: A Refresher | |
| |
| |
| |
Overview of LPDF | |
| |
| |
| |
Integrative Events | |
| |
| |
| |
Selecting the Project Schedule | |
| |
| |
| |
Mapping the Value Stream | |
| |
| |
| |
Project Leadership and Management | |
| |
| |
| |
Project Room | |
| |
| |
| |
| |
| |
| |
From Traditional to Lean Systems Engineering | |
| |
| |
| |
Successes and Failures of Traditional Systems Engineering | |
| |
| |
| |
Waste in Traditional Systems Engineering | |
| |
| |
| |
Beginnings of Lean Systems Engineering | |
| |
| |
| |
Lean Systems Engineering Working Group of INCOSE | |
| |
| |
| |
Value in Lean Systems Engineering | |
| |
| |
| |
Development of llean Enablers for Systems Engineering (LEfSE) | |
| |
| |
| |
Strategy | |
| |
| |
| |
Development of LEfSE | |
| |
| |
| |
Survey | |
| |
| |
| |
Benchmarking with NASA and GAO Recommendations | |
| |
| |
| |
Version 1.0 and Awards | |
| |
| |
| |
Lean Enablers for Systems Engineering | |
| |
| |
| |
Organization | |
| |
| |
| |
Tables with llean Enablers for Systems Engineering;(LEfSE) | |
| |
| |
| |
Lean Principle 1: Value | |
| |
| |
| |
Lean Principle 2: Map the Value Stream (Plan the Program) | |
| |
| |
| |
Lean Principle 3: Flow | |
| |
| |
| |
Lean Principle 4: Pull | |
| |
| |
| |
Lean Principle 5: Perfection | |
| |
| |
| |
Lean Principle 6: Respect for People | |
| |
| |
| |
General Guidance for Implementation | |
| |
| |
| |
General Guidance for Implementing LEfSE | |
| |
| |
| |
Early Case Studies | |
| |
| |
| |
Rockwell Collins, Incorporated (RC) | |
| |
| |
| |
Thales Aerospace, France | |
| |
| |
| |
Rafael, Israel | |
| |
| |
| |
EADS and AFIS | |
| |
| |
| |
Early Results from a Study by E. Honour | |
| |
| |
| |
Toyota | |
| |
| |
Glossary of Abbreviations | |
| |
| |
Glossary of Idioms, Colloquialisms and Foreign Expressions (bold and italicized in the text) | |
| |
| |
References | |
| |
| |
| |
Incose Web Page with Leise | |
| |
| |
| |
Mapping of Lefse onto Incose Processes | |
| |
| |
Author's Biography | |
| |
| |
Index | |