| |
| |
| |
Introduction | |
| |
| |
| |
The Combustion Process: Fuel | |
| |
| |
Fuel Oil | |
| |
| |
The Combustion Process | |
| |
| |
Combustion Chambers | |
| |
| |
| |
Oil Burners: Vertical Rotary Oil Burners | |
| |
| |
Horizontal Rotary Oil Burners | |
| |
| |
Low Pressure Air Atomizing Oil Burners | |
| |
| |
High Pressure Gun Type Oil Burners | |
| |
| |
Flame Retention Head Oil Burners | |
| |
| |
Forced Draft Oil Burners | |
| |
| |
| |
The Air Delivery System: Fresh Air Louvres | |
| |
| |
Air Delivery System Parts | |
| |
| |
"Shell Head" Burners | |
| |
| |
Flame Retention Head Oil Burners | |
| |
| |
Forced Draft Oil Burners | |
| |
| |
Setting the Retention Head | |
| |
| |
Air Delivery Patterns | |
| |
| |
Flue Gas Removal | |
| |
| |
Chimneys and Draft | |
| |
| |
Draft Inducers | |
| |
| |
Stack Dampers | |
| |
| |
Servicing the Air Delivery System | |
| |
| |
| |
The Fuel Delivery System-Oil Tank Installations: Fuel Storage Tanks-Gravity Systems | |
| |
| |
Oil Safety Valve | |
| |
| |
Fuel Oil Storage Tanks-Two pipe Systems | |
| |
| |
Two pipe Systems-Surface Installation | |
| |
| |
| |
The Fuel Delivery System-Pumps and Nozzles: Fuel System Operation | |
| |
| |
Fuel Units (Pumps) | |
| |
| |
Pump Testing Procedures | |
| |
| |
Oil Supply Problems | |
| |
| |
Pump Replacement Procedure | |
| |
| |
Two stage Pumps-Two pipe Systems | |
| |
| |
The Oil Burner Nozzle | |
| |
| |
Nozzle Functions | |
| |
| |
Nozzle Operation | |
| |
| |
Nozzle Selection-Replacement | |
| |
| |
Cold Oil and Nozzle Performance | |
| |
| |
Nozzle Parts | |
| |
| |
Procedure For Replacing the Nozzle | |
| |
| |
The Nozzle Adaptor | |
| |
| |
Delayed Opening Valve | |
| |
| |
Oil Line Connections | |
| |
| |
| |
The Ignition System: Puff Back | |
| |
| |
Ignition System Parts | |
| |
| |
The Ignition Transformer | |
| |
| |
High Tension Wire and Bus Bars | |
| |
| |
Electrodes | |
| |
| |
Servicing the Ignition System | |
| |
| |
| |
The Steam Heating System: Steam Boilers | |
| |
| |
Steam Boiler Trim | |
| |
| |
The Single Pipe Stream System | |
| |
| |
Single Pipe Steam System Operation | |
| |
| |
| |
Hot Water Heating Systems: Gravity Feed Hot Water Heating System | |
| |
| |
Operation of the Gravity Feed Hot Water System | |
| |
| |
Forced Circulation Hot Water Heating Systems | |
| |
| |
Operation of the Forced Circulation Hot Water System | |
| |
| |
Hydronic Heating Systems | |
| |
| |
Radiant Heating Systems | |
| |
| |
Zoning | |
| |
| |
| |
Warm Air Heating Systems: Gravity Feed Warm Air System | |
| |
| |
Forced Circulation Warm Air System | |
| |
| |
Modern Warm Air Furnace | |
| |
| |
Air Filters | |
| |
| |
Humidifiers | |
| |
| |
Heating-Cooling System | |
| |
| |
Zoning | |
| |
| |
| |
Basic Electricity: Series Circuit | |
| |
| |
Parallel Circuits | |
| |
| |
Fuses-Circuit Breakers | |
| |
| |
Electrical Connections | |
| |
| |
| |
Electrical Equipment: Solenoid Valves | |
| |
| |
Relays | |
| |
| |
Transformers | |
| |
| |
Motors | |
| |
| |
Bearings | |
| |
| |
Capacitors | |
| |
| |
Zone Valves | |
| |
| |
| |
Oil Burner Controls: Water Level Controls | |
| |
| |
Steam Pressure Controls | |
| |
| |
Hot Water Controls | |
| |
| |
Thermostats | |
| |
| |
Fan-Limit Controls | |
| |
| |
humidity Controls | |
| |
| |
Primary Controls | |
| |
| |
Servicing Stack Mounted Primary Controls | |
| |
| |
Cad Cell Primary Controls | |
| |
| |
Switching Relays | |
| |
| |
Replacing Controls | |
| |
| |
| |
Control Circuit Wiring: Residential Steam System Wiring | |
| |
| |
Residential Hot Water System Wiring | |
| |
| |
Warm Air System Circuits | |
| |
| |
| |
Service Procedures-Burner Not Operating: Using | |
| |
| |
| |
BNO-Not Locked Out on Safety, Using | |
| |
| |
| |
BNO-Locked Out on Safety-Motor, Using | |
| |
| |
| |
BNO-Locked Out on Safety-Motor, Using | |
| |
| |
| |
BNO-Locked Out on Safety-No Ignition, Using | |
| |
| |
| |
BNO-Locked Out on Safety-No Oil, Using | |
| |
| |
| |
BNO-Locked Out on Safety-No Oil, Using | |
| |
| |
| |
BNO-Locked Out on Safety | |
| |
| |
| |
Service Procedures-Improper Operation: Using | |
| |
| |
| |
Improper Operation-Puff Back, Using | |
| |
| |
| |
Improper Operation-Vibration, Using | |
| |
| |
| |
Improper Operation-Smoke and Soot, Using | |
| |
| |
| |
Improper Operation-Oil Odor, Using | |
| |
| |
| |
Improper Operation-Not Enough Heat, Using | |
| |
| |
| |
Improper Operation-Using Too Much Oil, Using | |
| |
| |
| |
Improper Operation-Boiler Loses Water, Using | |
| |
| |
| |
Improper Operation-Boiler Floods, Using | |
| |
| |
| |
Improper Operation-Relief Valve Opens | |
| |
| |
| |
Domestic Hot Water: Generator and Storage Tank, External Tankless Hot Water Heaters, Internal Tankless Hot Water Heaters, Indirect Hot Water Heaters, Oil Fired Hot Water Heaters | |
| |
| |
| |
Annual Tune-up: Using | |
| |
| |
| |
Chimney and Boiler Cleaning, Using | |
| |
| |
| |
Oil Burner Tune-up | |
| |
| |
| |
Combustion Efficiency Testing: The Draft Test, The Smoke Test, The CO2 Test, The Stack T | |