| |
| |
Preface to the Millenium Edition | |
| |
| |
Land Remediation | |
| |
| |
The Landfill Tax | |
| |
| |
Abbreviations | |
| |
| |
Acknowledgements | |
| |
| |
| |
General | |
| |
| |
Purpose and Content of the Book | |
| |
| |
Outline of the Tendering and Estimating Process | |
| |
| |
| |
Preliminaries and General Items | |
| |
| |
Method Related Charges | |
| |
| |
Checklist of Items | |
| |
| |
Insurances and Bond | |
| |
| |
Worked Example | |
| |
| |
| |
Resources | |
| |
| |
Notes from the Working Rule Agreement | |
| |
| |
Labour Costs | |
| |
| |
Basic Material Prices | |
| |
| |
Plant | |
| |
| |
| |
Unit Costs (Civil Engineering Works) | |
| |
| |
Introductory | |
| |
| |
Notes | |
| |
| |
Guidance Notes | |
| |
| |
| |
General Items | |
| |
| |
| |
Ground Investigation | |
| |
| |
| |
Geotechnical and Other Specialist Processes | |
| |
| |
| |
Demolition and Site Clearance | |
| |
| |
| |
Earthworks | |
| |
| |
| |
In Situ Concerete | |
| |
| |
| |
Concrete Ancillaries | |
| |
| |
| |
Precast Concrete | |
| |
| |
| |
Pipework - Pipes | |
| |
| |
| |
Pipework-Fittings and Valves | |
| |
| |
| |
Pipework-manholes and Pipework Ancillaries | |
| |
| |
| |
Pipework - Supports and Protection, Ancillaries to Laying and Excavation | |
| |
| |
| |
Structural Metalwork | |
| |
| |
| |
Miscellaneous Metalwork | |
| |
| |
| |
Timber | |
| |
| |
| |
Piling | |
| |
| |
| |
Piling Ancillaries | |
| |
| |
| |
Roads and Pavings | |
| |
| |
| |
Rail track | |
| |
| |
| |
Tunnels | |
| |
| |
| |
Brickwork, Blockwork and Masonry | |
| |
| |
| |
Painting | |
| |
| |
| |
Waterproofing | |
| |
| |
| |
Miscellaneous Work | |
| |
| |
| |
Sewer and Water Main Renovation and Ancillary Works | |
| |
| |
| |
Simple Building Works Incidental to Civil Engineering Work | |
| |
| |
| |
Unit Costs (Highway Works) | |
| |
| |
Introductory Notes | |
| |
| |
Guidance Notes | |
| |
| |
Series 100 Preliminaries | |
| |
| |
Series 200 Site Clearance | |
| |
| |
Series 300 Fencing and Environmental Barriers | |
| |
| |
Series 400 Safety Fences, Safety Barriers and Pedestrian Guard Rails | |
| |
| |
Series 500 Drainage and Service Ducts | |
| |
| |
Series 600 Earthworks | |
| |
| |
Series 700 Pavements | |
| |
| |
Series 1100 Kerbs, Footways and Paved Areas | |
| |
| |
Series 1200 Traffic Signs and Road Markings | |
| |
| |
Series 1300 Road Lighting Columns and Brackets | |
| |
| |
Series 1400 Electrical Work for Road Lighting and Traffic Signs | |
| |
| |
Series 1500 Motorway Communcations | |
| |
| |
Series 1600 Piling and Diaphragm Walling | |
| |
| |
Series 1700 Structural Concrete | |
| |
| |
Series 1800 Steelwork for Structures | |
| |
| |
Series 1900 Protection of Steelwork against Corrosion | |
| |
| |
Series 2000 Waterproofing for Structure | |
| |
| |
Series 2100 Bridge Bearings | |
| |
| |
Series 2200 Parapets | |
| |
| |
Series 2300 Bridge Expansion Joints and Sealing of Gaps | |
| |
| |
Series 2400 Brickwork, Blockwork and Stonework | |
| |
| |
Series 2500 Structures Designed by Contractor | |
| |
| |
| |
Unit Costs (Ancillary Building Works) | |
| |
| |
Introductory | |
| |
| |
Notes | |
| |
| |
Substructure | |
| |
| |
Superstructure | |
| |
| |
Frame to Roof | |
| |
| |
Frame and Upper Floors (Combined) | |
| |
| |
Roof | |
| |
| |
Stairs | |
| |
| |
External Walls | |
| |
| |
Windows and External Doors | |
| |
| |
Internal Walls, Partitions and Doors | |
| |
| |
Internal Doors | |
| |
| |
Wall Finishes | |
| |
| |
Floor Finishes | |
| |
| |
Ceiling Finishes | |
| |
| |
Decorations | |
| |
| |
Fittings and Furnishings | |
| |
| |
Sanitary and Disposal | |
| |
| |
Installations | |
| |
| |
Services and Installations | |
| |
| |
Water Installations | |
| |
| |
Heating, Air-Conditioning and Ventilating Installations | |
| |
| |
Electrical Installations | |
| |
| |
Gas Installaions | |
| |
| |
Lift and Conveyory Installations | |
| |
| |
Protective, Communication and Special Installations | |
| |
| |
Builders' work in Connection with Services | |
| |
| |
Site Work | |
| |
| |
Landscaping and External Works | |
| |
| |
External Services | |
| |
| |
Drainage | |
| |
| |
| |
Oncosts and Profit | |
| |
| |
Risk/Opportunity | |
| |
| |
Head Office Overheads | |
| |
| |
Profit | |
| |
| |
Finance Costs- Assessment of Contract Investment | |
| |
| |
Value Added Tax | |
| |
| |
Tender Summary | |
| |
| |
| |
Costs and Tender Prices Indices | |
| |
| |
Introduction | |
| |
| |
Price Adjustment Formula Indices | |
| |
| |
A Constructed Costs Index based on the Price Adjustment Formula Indices | |
| |
| |
The Road Construction | |
| |
| |
Tender Price | |
| |
| |
Index | |
| |
| |
| |
Daywork | |
| |
| |
Introduction | |
| |
| |
| |
General Servicing of Plant | |
| |
| |
| |
Fuel Distribution | |
| |
| |
| |
Welfare Facilities | |
| |
| |
| |
Handling and Offloading Materials | |
| |
| |
| |
Professional Fees | |
| |
| |
Consulting Engineer's Fees | |
| |
| |
Quantity Surveyor's Fees | |
| |
| |
| |
Approximate Estimates | |
| |
| |
| |
Industrial and Commercial Buildings and Civil Engineering | |