| |
| |
Foreword | |
| |
| |
Preface | |
| |
| |
| |
Introduction to System Engineering | |
| |
| |
| |
Definition of a System | |
| |
| |
| |
The Characteristics of a System | |
| |
| |
| |
Categories of Systems | |
| |
| |
| |
System of Systems (SOS) | |
| |
| |
| |
The Current Environment: Some Challenges | |
| |
| |
| |
The Need for System Engineering | |
| |
| |
| |
The System Life Cycle | |
| |
| |
| |
Definition of System Engineering | |
| |
| |
| |
Requirements for System Engineering | |
| |
| |
| |
System Architecture | |
| |
| |
| |
System Science | |
| |
| |
| |
System Analysis | |
| |
| |
| |
Some Additional System Models | |
| |
| |
| |
System Engineering in the Life Cycle (Some Applications) | |
| |
| |
| |
Related Terms and Definitions | |
| |
| |
| |
Concurrent/Simultaneous Engineering | |
| |
| |
| |
Some Major Supporting Design Disciplines | |
| |
| |
| |
Logistics and Supply Chain Management (SCM) | |
| |
| |
| |
Integrated System Maintenance and Support | |
| |
| |
| |
Data and Information Management | |
| |
| |
| |
Configuration Management (CM) | |
| |
| |
| |
Total Quality Management (TQM) | |
| |
| |
| |
Total System Value and Life-Cycle Cost (LCC) | |
| |
| |
| |
System Engineering Management | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
The System Engineering Process | |
| |
| |
| |
Definition of the Problem (Current Deficiency) | |
| |
| |
| |
System Requirements (Needs Analysis) | |
| |
| |
| |
System Feasibility Analysis | |
| |
| |
| |
System Operational Requirements | |
| |
| |
| |
The Logistics and Maintenance Support Concept | |
| |
| |
| |
Identification and Prioritization of Technical Performance Measures (TPMs) | |
| |
| |
| |
Functional Analysis | |
| |
| |
| |
Functional Flow Block Diagrams (FFBDs) | |
| |
| |
| |
Operational Functions | |
| |
| |
| |
Maintenance and Support Functions | |
| |
| |
| |
Application of Functional Analysis | |
| |
| |
| |
Interfaces with Other Systems in a SOS Configuration | |
| |
| |
| |
Requirements Allocation | |
| |
| |
| |
Functional Packaging and Partitioning | |
| |
| |
| |
Allocation of System-Level Requirements to the Subsystem Level and Below | |
| |
| |
| |
Traceability of Requirements (Top-Down/Bottom-Up) | |
| |
| |
| |
Allocation of Requirements in a SOS Configuration | |
| |
| |
| |
System Synthesis, Analysis, and Design Optimization | |
| |
| |
| |
Design Integration | |
| |
| |
| |
System Test and Evaluation | |
| |
| |
| |
Categories of Test and Evaluation | |
| |
| |
| |
Integrated Test Planning | |
| |
| |
| |
Preparation for Test and Evaluation | |
| |
| |
| |
Test Performance, Data Collection, Analysis, and Validation | |
| |
| |
| |
System Modifications | |
| |
| |
| |
Production and/or Construction | |
| |
| |
| |
System Operational Use and Sustaining Support | |
| |
| |
| |
System Retirement and Material Recycling/Disposal | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
System Design Requirements | |
| |
| |
| |
Development of Design Requirements and Design-To Criteria | |
| |
| |
| |
Development of Specifications | |
| |
| |
| |
The Integration of System Design Activities | |
| |
| |
| |
Selected Design Engineering Disciplines | |
| |
| |
| |
Software Engineering | |
| |
| |
| |
Reliability Engineering | |
| |
| |
| |
Maintainability Engineering | |
| |
| |
| |
Human-Factors Engineering | |
| |
| |
| |
Safety Engineering | |
| |
| |
| |
Security Engineering | |
| |
| |
| |
Manufacturing and Production Engineering | |
| |
| |
| |
Logistics and Supportability Engineering | |
| |
| |
| |
Disposability Engineering | |
| |
| |
| |
Quality Engineering | |
| |
| |
| |
Environmental Engineering | |
| |
| |
| |
Value/Cost Engineering (Life-Cycle Costing) | |
| |
| |
| |
SOS Integration and Interoperability Requirements | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
Engineering Design Methods and Tools | |
| |
| |
| |
Conventional Design Practices | |
| |
| |
| |
Analytical Methods | |
| |
| |
| |
Information Technology, the Internet, and Emerging Technologies | |
| |
| |
| |
Current Design Technologies and Tools | |
| |
| |
| |
The Use of Simulation in System Engineering | |
| |
| |
| |
The Use of Rapid Prototyping | |
| |
| |
| |
The Use of Mock-ups | |
| |
| |
| |
Computer-Aided Design (CAD) | |
| |
| |
| |
Computer-Aided Manufacturing (CAM) | |
| |
| |
| |
Computer-Aided Support (CAS) | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
Design Review and Evaluation | |
| |
| |
| |
Design Review and Evaluation Requirements | |
| |
| |
| |
Informal Day-to-Day Review and Evaluation | |
| |
| |
| |
Formal Design Reviews | |
| |
| |
| |
Conceptual Design Review | |
| |
| |
| |
System Design Reviews | |
| |
| |
| |
Equipment/Software Design Reviews | |
| |
| |
| |
Critical Design Review | |
| |
| |
| |
The Design Change and System Modification Process | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
System Engineering Program Planning | |
| |
| |
| |
System Engineering Program Requirements | |
| |
| |
| |
The Need for Early System Planning | |
| |
| |
| |
Determination of Program Requirements | |
| |
| |
| |
System Engineering Management Plan (SEMP) | |
| |
| |
| |
Statement of Work | |
| |
| |
| |
Definition of System Engineering Functions and Tasks | |
| |
| |
| |
System Engineering Organization | |
| |
| |
| |
Development of a Work Breakdown Structure (WBS) | |
| |
| |
| |
Specification/Documentation Tree | |
| |
| |
| |
Technical Performance Measures (TPM) | |
| |
| |
| |
Development of Program Schedules | |
| |
| |
| |
Preparation of Cost Projections | |
| |
| |
| |
Program Technical Reviews and Audits | |
| |
| |
| |
Program Reporting Requirements | |
| |
| |
| |
Determination of Outsourcing Requirements | |
| |
| |
| |
Identification of Potential Suppliers | |
| |
| |
| |
Development of a Request for Proposal (RFP) | |
| |
| |
| |
Review and Evaluation of Supplier Proposals | |
| |
| |
| |
Selection of Suppliers and Contract Negotiation | |
| |
| |
| |
Supplier Monitoring and Control | |
| |
| |
| |
Integration of Design Specialty Plans | |
| |
| |
| |
Interfaces with Other Program Activities | |
| |
| |
| |
Management Methods/Tools | |
| |
| |
| |
Risk Management Plan | |
| |
| |
| |
Global Applications/Relationships | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
Organization for System Engineering | |
| |
| |
| |
Developing the Organizational Structure | |
| |
| |
| |
Customer, Producer, and Supplier Relationships | |
| |
| |
| |
Customer Organization and Functions | |
| |
| |
| |
Producer Organization and Functions (The Contractor) | |
| |
| |
| |
Functional Organization Structure | |
| |
| |
| |
Product-Line/Project Organization Structure | |
| |
| |
| |
Matrix Organizational Structure | |
| |
| |
| |
Integrated Product and Process Development (IPPD) | |
| |
| |
| |
Integrated Product/Process Teams (IPTs) | |
| |
| |
| |
System Engineering Organization | |
| |
| |
| |
Supplier Organization and Functions | |
| |
| |
| |
Human Resource Requirements | |
| |
| |
| |
Creating the Proper Organizational Environment | |
| |
| |
| |
Leadership Characteristics | |
| |
| |
| |
The Needs of the Individual | |
| |
| |
| |
Staffing the Organization | |
| |
| |
| |
Personnel Development and Training | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
System Engineering Program Evaluation | |
| |
| |
| |
Evaluation Requirements | |
| |
| |
| |
Benchmarking | |
| |
| |
| |
Evaluation of the System Engineering Organization | |
| |
| |
| |
Program Reporting, Feedback, and Control | |
| |
| |
| |
Summary | |
| |
| |
Questions and Problems | |
| |
| |
| |
Functional Analysis (Case-Study Examples) | |
| |
| |
| |
Life-Cycle Cost-Analysis Process | |
| |
| |
| |
Selected Case Studies (Seven Examples) | |
| |
| |
| |
Design Review Checklist | |
| |
| |
| |
Supplier Evaluation Checklist | |
| |
| |
| |
Selected Bibliography | |
| |
| |
Index | |