| |
| |
27201-07 Commercial Drawings (25 Hours) | |
| |
| |
Elective for Residential Path | |
| |
| |
Describes the types and uses of drawings prepared for commercial structures | |
| |
| |
Provides information about the format and content of commercial drawings and their use in conveying specific construction requirements | |
| |
| |
Describes the standard format for specifications | |
| |
| |
27202-07 Roofing Applications (25 Hours) | |
| |
| |
Elective for Commercial Path | |
| |
| |
Covers the common materials used in residential and light commercial roofing, along with the safety practices and application methods for these materials | |
| |
| |
Includes shingles, roll roofing, shakes, tiles, metal, and membrane roofs, as well as the selection and installation of roof vents | |
| |
| |
27203-07 Thermal and Moisture Protection (7.5 Hours) | |
| |
| |
Covers the selection and installation of various types of insulating materials in walls, floors, and attics | |
| |
| |
Also covers the uses and installation practices for vapor barriers and waterproofing materials | |
| |
| |
27204-07 Exterior Finishing (35 Hours) | |
| |
| |
Elective for Commercial Path | |
| |
| |
Covers the various types of exterior siding used in residential construction and their installation procedures, including wood, metal, vinyl, and cement board siding | |
| |
| |
27205-07 Cold-Formed Steel Framing (15 Hours) | |
| |
| |
Describes the types and grades of steel framing materials and includes instructions for selecting and installing metal framing for interior walls, exterior nonbearing walls, and partitions | |
| |
| |
27206-07 Drywall Installation (15 Hours) | |
| |
| |
Describes the various types of gypsum drywall, their uses, and the fastening devices and methods used to install them | |
| |
| |
Contains detailed instructions for installing drywall on walls and ceilings using nails, drywall screws, and adhesives | |
| |
| |
Also covers fire- and sound-rated walls | |
| |
| |
27207-07 Drywall Finishing (12.5 Hours) | |
| |
| |
Covers the materials, tools, and methods used to finish and patch gypsum drywall | |
| |
| |
Includes coverage of both automatic and manual taping and finishing tools | |
| |
| |
27208-07 Doors and Door Hardware (20 Hours) | |
| |
| |
Covers the installation of metal doors and related hardware in steel-framed, wood-framed, and masonry walls, along with their related hardware, such as locksets and door closers | |
| |
| |
Also covers the installation of wooden doors, folding doors, and pocket doors | |
| |
| |
27209-07 Suspended Ceilings (15 Hours) | |
| |
| |
Elective for Residential Path | |
| |
| |
Includes the materials, layout, and installation procedures for many types of suspended ceilings used in commercial construction, as well as ceiling tiles, drywall suspension systems, and pan-type ceilings | |
| |
| |
27210-07 Window, Door, Floor, and Ceiling Trim (25 Hours) | |
| |
| |
Covers the different types of trim used in finish work | |
| |
| |
Focuses on the proper methods for selecting, cutting, and fastening trim to provide a professional finished appearance | |
| |
| |
27211-07 Cabinet Installation (10 Hours) | |
| |
| |
Provides detailed instructions for the selection and installation of base and wall cabinets and countertops | |
| |
| |
27212-07 Cabinet Fabrication (10 Elective Hours) | |
| |
| |
Provides an introduction to the materials, tools, and methods used in cabinetmaking | |
| |
| |
Practice projects help the trainee learn the various joining techniques, while providing practice on stationary power tools | |