| |
| |
Preface | |
| |
| |
| |
Background Information | |
| |
| |
Industry Orientation | |
| |
| |
Regulations and Court Rulings in the United States | |
| |
| |
Structured Cabling Systems (SCS) | |
| |
| |
Codes, Standards, and Regulations | |
| |
| |
Codes Affecting Telecommunications | |
| |
| |
Standards Affecting Telecommunications | |
| |
| |
Recognized Regulatory and Reference Bodies | |
| |
| |
Plans and Specifications | |
| |
| |
Media | |
| |
| |
Connectorization | |
| |
| |
Transmission | |
| |
| |
Copper Cable Media | |
| |
| |
Optical Fiber Cable Media | |
| |
| |
Grounding and Bonding | |
| |
| |
Protection Systems | |
| |
| |
Telecommunications Grounding Practices | |
| |
| |
Telecommunications Bonding Practices | |
| |
| |
System Practices | |
| |
| |
Equipment Grounding | |
| |
| |
Telecommunications Circuit Protectors | |
| |
| |
Protector Technology | |
| |
| |
Primary Protector Installation Practices | |
| |
| |
Common Safety Practices | |
| |
| |
Personal Protective Equipment (PPE) | |
| |
| |
Hazardous Environments--Indoor | |
| |
| |
Electrical Hazards | |
| |
| |
Hazardous Environments--Outdoors | |
| |
| |
Safety Planning | |
| |
| |
| |
Job-Site Inspection Checklist | |
| |
| |
Professionalism | |
| |
| |
| |
Planning | |
| |
| |
Introduction | |
| |
| |
Putting the Plan to Use | |
| |
| |
Summary | |
| |
| |
| |
Designer's Drawings | |
| |
| |
| |
Materials List | |
| |
| |
| |
Labor List | |
| |
| |
| |
Project Time Line | |
| |
| |
| |
Project Schedule | |
| |
| |
| |
Site Survey Checklists | |
| |
| |
| |
Job Change Order | |
| |
| |
| |
Scope of Work (Example) | |
| |
| |
| |
Installing Supporting Structures | |
| |
| |
Introduction | |
| |
| |
Support Structures in Telecommunications Spaces | |
| |
| |
Cable Pathway Support Structures | |
| |
| |
Installing Cable Support Systems | |
| |
| |
Installing Grounding Infrastructure | |
| |
| |
| |
Pulling Cable | |
| |
| |
Introduction | |
| |
| |
Common Project Procedures | |
| |
| |
Cable Pulling Setup (Horizontal) | |
| |
| |
Pulling Horizontal Cable in Conduit | |
| |
| |
Pulling Horizontal Cable in Ceiling Spaces | |
| |
| |
Pulling Horizontal Cable in Raceways | |
| |
| |
Pulling Backbone in Vertical Pathway--From Top Down | |
| |
| |
Pulling Backbone in Vertical Pathway--From Bottom Up | |
| |
| |
Pulling Backbone--Horizontal | |
| |
| |
Pulling Optical Fiber Cable | |
| |
| |
| |
Firestopping | |
| |
| |
Introduction | |
| |
| |
Protection Codes and Ratings | |
| |
| |
Firestopping Systems | |
| |
| |
Firestopping Methods | |
| |
| |
| |
UL Numbering System | |
| |
| |
| |
Firestopping Decision Methods | |
| |
| |
| |
Approved Firestopping Methods | |
| |
| |
| |
Cable Termination Practices | |
| |
| |
Introduction | |
| |
| |
Pretermination Functions | |
| |
| |
Copper Insulation Displacement Connection (IDC) Termination | |
| |
| |
Coaxial Cable Terminations | |
| |
| |
Fiber Termination | |
| |
| |
| |
Splicing Cable | |
| |
| |
Copper Cable | |
| |
| |
Optical Fiber Cable | |
| |
| |
Summary | |
| |
| |
| |
Testing Cable | |
| |
| |
Testing Cabling | |
| |
| |
Copper Cabling--Horizontal Cabling | |
| |
| |
Backbone Cabling | |
| |
| |
Coaxial Cabling--Data | |
| |
| |
50-Ohm Coaxial Cabling | |
| |
| |
75-Ohm Coaxial Cabling | |
| |
| |
Optical Fiber Cable | |
| |
| |
Testing Optical Fiber Cabling--Light Source and Power Meter | |
| |
| |
Light Source and Power Meter Testing of Short Length Cable Assemblies | |
| |
| |
Optical Time Domain Reflectometer (OTDR) | |
| |
| |
| |
Fiber Performance Calculations Worksheet | |
| |
| |
| |
Fiber Link Attenuation Record | |
| |
| |
| |
Troubleshooting | |
| |
| |
Introduction | |
| |
| |
General Reference | |
| |
| |
Copper Cable | |
| |
| |
Optical Fiber Cable | |
| |
| |
| |
Typical OTDR Fault Presentations | |
| |
| |
| |
Retrofit Installations | |
| |
| |
Overview | |
| |
| |
System Cutover | |
| |
| |
Glossary | |
| |
| |
Numbers | |
| |
| |
Definitions | |
| |
| |
Abbreviations, Acronyms, and Units of Measure | |
| |
| |
Bibliography | |
| |
| |
Index | |